[Federal Register: May 12, 2003 (Volume 68, Number 91)]
[Notices]
[Page 25343-25347]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr12my03-36]
-----------------------------------------------------------------------
DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
[Docket No. 000202024-3109-03 I.D. 030303B]
Announcement of Funding Opportunity to submit proposals for the
South Florida Ecosystem Research and Monitoring Program (SFP) FY04
AGENCY: National Centers for Coastal Ocean Sciences/Center for
Sponsored Coastal Ocean Research/Coastal Ocean Program (NCCOS/CSCOR/
COP), National Ocean Service (NOS), National Oceanic and Atmospheric
Administration (NOAA), Department of Commerce.
ACTION: Notice of Funding Availability for financial assistance for
project grants and cooperative agreements.
-----------------------------------------------------------------------
SUMMARY: The purpose of this notice is to advise the public that NCCOS/
CSCOR/COP is soliciting 1-year and 2-year proposals to support coastal
ecosystem studies in South Florida including Florida Bay, Florida Keys,
the Florida Keys National Marine Sanctuary (FKNMS), and adjacent
coastal waters. It will provide support for the NOAA South Florida
Program and the FKNMS. The overall goal of this Announcement is to fund
high priority research and long term observational data collection
needed to predict the impacts of Everglades restoration on the South
Florida coastal ecosystem and to fulfill NOAA commitments to the South
Florida Ecosystem Restoration effort and the Comprehensive Everglades
Restoration Plan. Funding is contingent upon the availability of Fiscal
Year 2004 and 2005 Federal appropriations. It is anticipated that
projects funded under this announcement will have a March 1, 2004 start
date.
DATES: The deadline for receipt of proposals at the COP office is 3
p.m., local time July 16, 2003. (Note that late-arriving applications
provided to a delivery service on or before July 16, 2003, with
delivery guaranteed before 3 p.m., local time on July 16,2003, will be
accepted for review if the applicant can document that the application
was provided to the delivery service with delivery to the address
listed below guaranteed by the specified closing date and time; and, in
any event, the proposals are received in the NCCOS/CSCOR/COP office by
3 p.m., local time, no later than 2 business days following the closing
date.)
ADDRESSES: Submit the original and 15 copies of your proposal to Center
for Sponsored Coastal Ocean Research/Coastal Ocean Program (N/SCI 2),
National Oceanic and Atmospheric Administration, 1305 East-West
Highway, SSMC4, 8th Floor Station 8243, Silver Spring, MD 20910,
attention SFP 2004.
NOAA and Standard Form Applications with instructions are
accessible on the following COP Internet Site: http://www.cop.noaa.gov
under the COP Grants Information Section, Part D, Application Forms for
Initial Proposal Submission.
Forms may be viewed and, in most cases, filled in by computer. All
forms must be printed, completed, and mailed to NCCOS/CSCOR/COP with
original signatures. If you are unable to access this information, you
may call COP at 301-713-3338 to leave a mailing request.
FOR FURTHER INFORMATION CONTACT: Technical Information. Larry Pugh, SFP
2004 Program Manager, NCCOS/CSCOR/COP, 301-713-3338/ext 160, Internet:
larry.pugh@noaa.gov. Business Management Information. Leslie McDonald, NCCOS/CSCOR/COP
Grants Administrator, 301-713-3338/ext 155, Internet:
Leslie.McDonald@noaa.gov.
SUPPLEMENTARY INFORMATION:
Electronic Access
Background information on the NOAA South Florida Program, including
descriptions of presently funded projects, results, data management,
and programmatic infrastructure (including small boat access and
policy) can be found at http://www.aoml.noaa.gov/ocd/sferpm.
Background information on the Florida Bay and Adjacent Marine
Systems Interagency Science Program, including the Program Management
Committee (PMC), Scientific Oversight Panel (SOP), copies of the annual
science conference abstracts, workshop reports, and present Strategic
Science Plan, can be found at http://www.aoml.noaa.gov/flbay.
Background information regarding Florida Keys National Marine
Sanctuary can be found at http://www.fknms.nos.noaa.gov.
Background information regarding South Florida Ecosystem
Restoration (SFER) in general can be found at http://www.sfrestore.org,
while the Comprehensive Everglades Restoration Plan (CERP), Florida
Bay/Florida Keys Feasibility Study, and RECOVER's South Estuaries
Monitoring and Assessment Plan to which the projects funded herein are
anticipated to contribute to can be found at http://www.evergladesplan.org
.
[[Page 25344]]
Background
Program Description
For complete program description and other requirements criteria
for the NCCOS/CSCOR/Coastal Ocean Program, see the General Grant
Administration Terms and Conditions for the Coastal Ocean Program
annual notification in the Federal Register November 8, 2002(67 FR
68103) and at the COP home page. Unless stated otherwise, in this
notice, the requirements and procedures contained in the November 8,
2002 annual notification are applicable to this solicitation.
This program is one of the Federal and state programs contributing
to the Florida Bay and Adjacent Marine Systems Interagency Science
Program, which is designed to understand and predict the effects of
South Florida ecosystem restoration.
The activities conducted to restore the South Florida ecosystem
occur predominantly upstream of Florida Bay, and restoration impacts
may not be direct or immediate. Through funding of the research areas
identified here, NCCOS/CSCOR/COP will fund an integrated suite of
activities to better understand the coastal and marine ecosystem
adjacent to the Everglades, comprising Florida Bay and the FKNMS. The
Goal of the complete effort is to develop a capability to predict the
impacts of proposed Everglades Restoration activities on the coastal
system from the mangroves to the coral reefs.
Research Areas
To address the goal of developing a capability to predict changes
in coastal ecosystems resulting from Restoration activities, this
announcement has five specific areas of interest: nutrient inputs and
dynamics, water quality, circulation and physical oceanography,
fisheries and protected resources, and Florida Keys habitat
characterization and research.
(A) Nutrient Inputs and Dynamics. Proposals are solicited to
address nutrient cycles within the water column and between the water
column and benthos. Priority consideration for selection in this area
will be given to nutrient proposals that cover the biogeochemical
processes (including the microbial loop) governing the bio-availability
of the organic forms of plant nutrients.
(B) Water Quality. The health of the coral reef community of the
FKNMS depends upon the quality (temperature, salinity, nutrients,
inorganic particulate load, light fields, and chemical contaminants) of
the waters that flow over them. With Everglades restoration, water
quality throughout South Florida coastal waters will be changed.
Proposals are now solicited that address the chemical, biological, and
optical characteristics of Bay waters that exit Keys passes and
potentially reach the reef tract and protected areas in the FKNMS
including the Dry Tortugas Ecological Reserve. These should address
timely dissemination of information to the Interagency SFER science
community and the public. Priority consideration for selection in this
area will be given to projects coordinated with and complementary to
physical oceanographic field studies.
(C) Circulation and Physical Oceanography. In the area of
Circulation and Physical Oceanography, emphasis is placed on predicting
the impacts of restoration scenarios and actions upstream and along the
Keys, in the context of the physical variability of the natural system.
Priority consideration for selection in this area will be given to
proposals that address the following research topics:
(1) Measuring oceanographic parameters needed to verify and
initialize regional and interior Bay circulation models;
(2) Determining the interconnections between the Gulf of Mexico
loop and Florida currents and the Dry Tortugas Ecological Reserve
(e.g.,quantifying flows entering the Florida Bay interior along its
western margin and those intermittently exiting through Keys passages
and potentially reaching the reef tract);
(3) Determining basin residence and turnover times, circulation,
and flow within the Bay and across the banktops; or
(4) Developing a hydrodynamic model of the coastal seas adjacent to
Florida Bay and the Florida Keys for use in providing boundary
conditions for coastal limited area models in the region and for
evaluating simulations of restoration scenarios.
(D) Fisheries and Protected Resources. Ecosystem changes caused by
South Florida Ecosystem Restoration activities have ultimate impacts on
the sustainability of higher trophic level (HTL) species, including
fishery and protected resources, which have widely recognized
importance.
Proposals are solicited to build models and provide information to
increase predictive capability in linking higher trophic levels to
ecosystem restoration activities. Priority consideration for selection
in this area will be given to proposals having a modeling component, or
interdisciplinary emphasis directed at the following research problems:
(1) Determining human (e.g., water management, fishing, excess
nutrients, contaminants) and natural influences on biological processes
affecting growth, survival, and recruitment of HTL species;
(2) Determining and modeling the major factors that influence
distribution and abundance patterns and community, ecosystem and
trophic structure;
(3) Identifying and modeling major pathways, mechanisms, and
influencing factors in the transport of pre-settlement stages of
offshore-spawning species onto nursery grounds; or
(4) Determining the processes impacting early settlement stage
larvae and recruitment of important game fishes such as red drum,
snook, tarpon, bone fish, and other estuarine and euryhaline dependent
fish and macro invertebrates.
(E) Florida Keys Habitat Characterization and Research. Coral
reefs, sea grass beds, and hard bottom communities comprise the
submerged, biogenic habitats of the FKNMS that support diverse species
assemblages. FKNMS management issues concerning these habitats cannot
be fully addressed because of limited ecological research. Fully
protected zones of the FKNMS, including the Dry Tortugas Ecological
Reserve have been created to assist in the protection of biological
diversity, disperse resource utilization in order to reduce user
conflicts, and lessen the concentrated impact to marine organisms on
heavily used reefs.
Emphasis in this area is placed on monitoring and research on sea
grass beds, coral reef, and hard bottom communities to provide a basis
for detecting potential changes associated with Everglades restoration
and other anthropogenic and natural factors and evaluating the
ecological benefits of FKNMS fully protected zones. Priority
consideration for selection in this area will be given to proposals
directed at the following research topics:
(1) Investigating the functional significance of hard bottom
communities in the FKNMS ecosystem, particularly the roles of filter-
feeding organisms and biogenic habitat structure.
(2) Monitoring and research on commercially important species (e.g.,
spiny lobster) and key depleted fishery species (e.g., queen conch);
(3) Creating ecosystem models of reef fish communities to predict
the effects of zoning on species diversity, abundance, and trophic
structure;
[[Page 25345]]
(4) Investigating how key ecological processes may be modified by
zoning; and
(5) Measuring oceanographic processes impacting upon the Tortugas
Ecological Reserve.
Other Participant Requirements
As participants in the Interagency Science Program for Florida Bay
and Adjacent Marine Systems, funded principal investigators will be
expected to:
(a) Participate in meetings for planning and coordination of the
Program. This includes attending and contributing to the annual
Interagency Science Conference, Research Team Meetings, and other
relevant technical workshops.
(b) Promptly quality control their data and make them readily
available through the Coordinating Office in accordance with the data
collection policy.
(c) Assist the Coordinating Office in the synthesis and
interpretation of research results and the development of products of
value to restoration and resource.
(d) Work with the Coordinating Office regarding small boat
requirements (if any) to schedule access to the dedicated research
vessel (description available on the SFERPM website earlier cited). If
your project will have small boat needs that you cannot furnish, please
provide description and schedule requirements in your proposal.
(e) If your project uses/relies on data/information from research
categories in this Announcement, other than the one you are proposing
to study, please describe.
Part I: Schedule and Proposal Submission
This document requests full proposals only. The provisions for
proposal preparation provided here are mandatory. Proposals received
after the published deadline (refer to DATES) or proposals that deviate
from the prescribed format will be returned to the sender without
further consideration. Information regarding this announcement,
additional background information, and required Federal forms are
available on the NCCOS/CSCOR/COP home page.
Full Proposals
Applications submitted in response to this announcement require an
original proposal and 15 proposal copies at time of submission. This
includes color or high-resolution graphics, unusually sized materials,
or otherwise unusual materials submitted as part of the proposal. For
color graphics, submit either color originals or color copies. The
stated requirements for the number of proposal copies provide for a
timely review process and is cleared by OMB control number 0648-0384.
(See Collection of information requirements.) Facsimile transmissions
and electronic mail submission of full proposals will not be accepted.
Required Elements
For clarity in the submission of proposals, the following
definitions are provided for recipient use: (1) Funding and/or Budget
Period - the period of time when Federal funding is available for
obligation by the recipient. The funding period must always be
specified in multi-year awards, using fixed year funds. This term may
also be used to mean ``budget period''. A budget period is typically 12
months. (2) Award and/or Project Period - the period established in the
award document during which Federal sponsorship begins and ends. The
term ``award period'' is also referred to as project period in 15 CFR
14.2(cc). Each proposal must also include the following nine elements
or it will be returned to sender without further consideration:
(1) Standard Form 424. At time of proposal submission, all
applicants anticipating direct funding shall submit the Standard Form,
SF-424, ``Application for Federal Assistance,'' to indicate the total
amount of funding proposed for the whole project period. This form is
to be the cover page for the original proposal and all requested
copies. Multi-institutional proposals must include signed SF-424 forms
from all institutions requesting funding.
(2) Signed Summary title page. The title page should be signed by
the Principal Investigator (PI). The Summary Title page identifies the
project's title starting with the acronym SFP 2004, a short title (less
than 50 characters); and the PI's name and affiliation, complete
address, phone, FAX and E-mail information. The requested budget for
each fiscal year should be included on the Summary Title page. Multi-
institution proposals must also identify the lead investigator from
each fiscal year for each institution and the requested funding for
each fiscal year for each institution on the title page, but no
signatures are required on the title page from the additional
institutions. Lead investigator and separate budget information is not
requested on the title page for institutions that are proposed to
receive funds through a subcontractor to the lead institution; however,
the COP Summary Proposal Budget Form and accompanying budget
justification must be submitted for each contractor. For further
details on budget information, please see Section (7) Budget of this
Part.
(3) One-page abstract/project summary. The Project Summary
(Abstract) Form, which is to be submitted at time of application, shall
include an introduction of the problem, rationale, scientific
objectives and/or hypotheses to be tested, and a brief summary of work
to be completed. The prescribed COP format for the Project Summary Form
can be found on the NCCOS/CSCOR/COP Internet site under the COP Grants
Information section, Part D.
The summary should appear on a separate page, headed with the
proposal title, institution(s), investigator(s), total proposed cost
and budget period. It should be written in the third person. The
summary is used to help compare proposals quickly and allows the
respondents to summarize these key points in their own words.
(4) Project description. The description of the proposed project
must be complete and divided into annual increments of work that
include: identification of the problem, scientific objectives, proposed
methodology, relevance to the SFP 2004 program goal. The project
description section (including relevant results from prior support)
should not exceed 15 pages. Page limits are inclusive of figures, other
visual materials, and letters of endorsement but exclusive of
references, milestone chart, and letters regarding cooperation from
unfunded collaborators.
This section should clearly identify project management with a
description of the functions of each PI within a team. It should
provide a full scientific justification for the research rather than
simply reiterating justifications presented in this document; and
should also include:
(a) The objective for the period of proposed work and its expected
significance;
(b) The relation to the present state of knowledge in the field and
relation to previous work and work in progress by the proposing
principal investigator(s);
(c) A discussion of how the proposed project lends value to the
program goal;
(d) Potential coordination with other investigators.
(5) References cited. Reference information is required. Each
reference must include the name(s) of all authors in the same sequence
in which they appear in the publications, the article title, volume
number, page numbers and
[[Page 25346]]
year of publications. While there is no established page limitation,
this section should include bibliographic citations only and should not
be used to provide parenthetical information outside the 15-page
project description.
(6) Milestone chart. Provide time lines of major tasks covering the
12- to 24-month duration of the proposed project.
(7) Budget. At time of proposal submission, all applicants are
required to submit a COP Summary Proposal Budget Form for each fiscal
year increment. Multi-institution proposals must include a COP Summary
Proposal Budget Form for each institution, and multi-investigator
proposals using a lead investigator with contractor's/subgrantee's
approach must submit a COP Summary Proposal Budget Form for each
contractor/subgrantee.
Each contractor or subgrantee should be listed as a separate item.
Describe products/services to be obtained and indicate the
applicability or necessity of each to the project. Provide separate
budgets for each subgrantee or contractor regardless of the dollar
value and indicate the basis for the cost estimates. List all
subgrantee or contractor costs under line item number 5--Subcontracts
on the COP Summary Proposal Budget Form.
The use of this budget form will provide for a detailed annual
budget and for the level of detail required by the NCCOS/CSCOR/COP
program staff to evaluate the effort to be invested by investigators
and staff on a specific project. The COP budget form is compatible with
forms in use by other agencies that participate in joint projects with
NCCOS/CSCOR/COP and can be found on the CSCOR/COP home page under
Grants Information section, Part D.
All applications must include a budget narrative and a
justification to support all proposed budget categories. The SF-424A,
Budget Information (Non-Construction) Form, will be requested only from
those applicants subsequently recommended for award.
Ship time needs should be clearly identified in the proposed
budget. The investigator is responsible for requesting ship time and
for meeting all requirements to ensure the availability of requested
ship time. Copies of relevant ship time request forms should be
included with the proposal.
(8) Biographical sketch. All principal and co-investigators must
provide summaries of up to 2 pages that include the following:
(a) A listing of professional and academic essentials and mailing
address;
(b) A list of up to five publications most closely related to the
proposed project and five other significant publications.
(c) A list of all persons (including their organizational
affiliation) in alphabetical order, with whom the investigator has
collaborated on a project or publication within the last 48 months,
including collaborators on the proposal and persons listed in the
publications. If no collaborators exist, this should be so indicated;
(d) A list of persons (including their organizational affiliation)
with whom the individual has had an association like thesis advisor or
postdoctoral scholar sponsor;
(e) A list of the names and institutions of the individual's own
graduate and postgraduate advisors.
The material presented in (c, d, and e) is used to assist in
identifying potential conflicts or bias in the selection of reviewers.
(9) Current and pending support. Describe all current and pending
Federal financial/funding support for all principal and co-
investigators, including subsequent funding in the case of continuing
grants.
(10) Proposal format and assembly. The original proposal should be
clamped in the upper left-hand corner, but left unbound. The 15
additional copies can be stapled in the upper left-hand corner or bound
on the left edge. The page margin must be one inch (2.5 cm) margins at
the top, bottom, left and right, and the typeface standard 12-points
size must be clear and easily legible. Proposals should be single
spaced.
Part II: Further Supplementary Information
(1) Funding availability. Funding is contingent upon receipt of
fiscal years 2004-2005 Federal appropriations. NOAA is committed to
continual improvement of the grants process and accelerating the award
of financial assistance to qualified recipients in accordance with the
recommendations of the Program Review Team (Information available at
www.noaa.gov). In order to fulfill these responsibilities, this
solicitation announces that approximately $2.8 million per year is
anticipated to be available for Fiscal Year 2004 and Fiscal Year 2005
for SFP projects, in award amounts to be determined by the proposals
and available funds.
Applicants are hereby given notice that funds have not yet been
appropriated for this SFP program. In no event will NOAA or the
Department of Commerce be responsible for proposal preparation costs if
this program fails to receive funding or is cancelled because of other
agency priorities. For prior fiscal history, for Fiscal years 2002 and
2003, NOAA had approximately $2.8 million available for this program,
with approximately $2.1 million of these funds provided by NCCOS/CSCOR/
COP and approximately $0.6 million provided by NOAA/NMFS/SEFC.
There is no guarantee that sufficient funds will be available to
make awards for all qualified projects. Publication of this notice does
not oblige NOAA to award any specific project or to obligate any
available funds. If one incurs any costs prior to receiving an award
agreement signed by an authorized NOAA official, one would do so solely
at one's own risk of these costs not being included under the award.
Publication of this notice does not obligate any agency to any
specific award or to obligate any part of the entire amount of funds
available. Recipients and subrecipients are subject to all Federal laws
and agency policies, regulations and procedures applicable to Federal
financial assistance awards.
(2) Project/Award period. Full Proposals can cover a project period
from 1 to 2 years, i.e., from date of award up to 24 consecutive months.
Multi-year awards may be funded incrementally on an annual basis, but,
once awarded, those awards will not compete for funding in subsequent
years. Each annual award shall require an Implementation Plan and
project description that can be easily divided into annual increments
of meaningful work representing solid accomplishments (if prospective
funding is not made available, or is discontinued).
The following is a description of Multi-Year Awards for those
applicants subsequently recommended for award. This information can
also be found on the COP web site under Grants Information. Multi-Year
Awards: Multi Year Awards are awards which have an award/project period
of more than 12 months of activity. Multi Year Awards are partially
funded when the awards are approved, and are subsequently funded in
increments. One of the purposes of Multi Year Awards is to reduce the
administrative burden on both the applicant and the operating unit. For
example, with proper planning, one application can suffice for the
entire multi year award period. Funding for each year's activity is
contingent upon the availability of funds from Congress, satisfactory
performance, and is at the sole discretion of the agency. Multi year
funding is appropriate for projects to be
[[Page 25347]]
funded for 2 to 5 years. Once approved, full applications are not
required for the continuations into the out years.
(3) Additional Evaluation Criteria. The Evaluation Criteria set out
in section(12)(b) of the November 8, 2002 Federal Register Notice,
under Research Performance Competence, is amended to include the
following: The capability of the investigator and collaborators to
complete the proposed work in light of present commitments to other
projects. Therefore, please discuss the percentage of time
investigators and collaborators have devoted to other Federal or non-
Federal projects, as compared to the time that will be devoted to the
project solicited under this notice.
(4) Other requirements. The Department of Commerce Pre-Award
Notification Requirements for Grants and Cooperative Agreements
contained in the Federal Register October 1, 2001 (66 FR 49917), as
amended by the Federal Register notice published on October 30, 2002
(67 FR 66109), are applicable to this solicitation.
(5) Intergovernmental review. Applications under this program are
not subject to Executive Order 12372, ``Intergovernmental Review of
Federal Programs.'' It has been determined that this notice is not
significant for purposes of Executive Order 12866. Pursuant to 5 U.S.C.
553(a) (2), an opportunity for public notice and comment is not
required for this notice relating to grants, benefits and contracts.
Because this notice is exempt from the notice and comment provisions of
the Administrative Procedure Act, a Regulatory Flexibility Analysis is
not required, and none has been prepared. It has been determined that
this notice does not contain policies with Federalism implications as
that term is defined in Executive Order 13132.
(6) Collection of information requirements. This notification
involves collection-of-information requirements subject to the
Paperwork Reduction Act. The use of Standard Forms 424, 424A, has been
approved by the Office of Management and Budget (OMB) under control
numbers 0348-0043 and 0348-0044.
The following requirements have been approved by OMB under control
number 0648-0384; a Summary Proposal Budget Form (30 minutes per
response), a Project Summary Form (30 minutes per response), a
standardized format for the annual Performance Report (5 hours per
response), a standardized format for the Final Report (10 hours per
response), and the submission of up to 20 copies of proposals (10
minutes per response). The response estimates include the time for
reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the
collection of information. Send comments regarding these requirements
and the burden estimate, or any other aspect of this collection of
information, including suggestions for reducing this burden, to
leslie.mcdonald@noaa.gov. Copies of these forms and formats can be
found on the CSCOR/COP home page under Grant Information sections,
Parts D and F.
Notwithstanding any other provision of law, no person is required
to respond to, nor shall any person be subject to a penalty for failure
to comply with a collection of information subject to the requirements
of the Paperwork Reduction Act, unless that collection displays a
currently valid OMB control number.
Dated: May 7, 2003.
Ted. I. Lillestolen,
Captain, (NOAA) Associate Deputy Assistant Administrator, National
Ocean and Atmospheric Administration, National Ocean Service.
[FR Doc. 03-11741 Filed 5-9-03; 8:45 am]